Waste 360 is part of the Global Exhibitions Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Need to Know
Wheelabrator Saugus: Ash Landfill Capacity Extends Into Late 2017

Wheelabrator Saugus: Ash Landfill Capacity Extends Into Late 2017

Wheelabrator Saugus estimates that the ash landfill at their Saugus facility will reach permitted capacity between June and December of 2017.

Wheelabrator Saugus Vice President of Environmental, Health and Safety Jim Connolly said that shipping recovered metals to a Shrewsbury facility, lowered vegetation height and a new, thinner landfill cap design contributed to the increased space available.

Wheelabrator is currently operating under its ninth Department of Environmental Protection consent order, which permits the ash landfill to operate until it reaches a 50-foot capacity.

Continue reading at Saugus Wicked Local

Hide comments

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish