Waste360 is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Need to Know

Developer Drops 37-Year Battle to Build Indiana Landfill

Article-Developer Drops 37-Year Battle to Build Indiana Landfill

The prospect of a landfill ever being built on Mallard Lake property is over.

The owners of the 254 acres at 2452 E. 300N, which included 13 acres where a landfill permit had previously been granted, have repeatedly denied allegations from a citizens group about plans to open a landfill on the property.

Last week, property owners Bex Farms Inc., along with its affiliate, 600 Land Inc., said they were going to let the landfill permit expire.

Continue reading at TheHeraldBulletin.com

Hide comments
account-default-image

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish