Waste360 is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Need to Know

Cape Elizabeth, Me., Panel Proposes $1.3M Redesign of Recycling Center

Article-Cape Elizabeth, Me., Panel Proposes $1.3M Redesign of Recycling Center

A committee report calls for a long-term redesign of the Recycling Center that includes using outdoor trash compactors instead of a hopper building.

Town councilors received the report from the Solid Waste and Recycling Long Range Planning Committee on Monday, Sept. 14, and unanimously accepted it.

The committee’s recommended redesign will cost $1.3 million, with an annual operating cost of $589,000.

The 158-page report was created after eight months of work by the panel, which was formed last December to find a long-term solution for improving safety and traffic flow at the Recycling Center.

Continue reading at the Bangor Daily News

TAGS: Business
Hide comments
account-default-image

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish